Skip to main content
site map
contact
our facebook page pintrest
Dana Dykhouse Stadium - SDSU

All Metal Manufacturing finished fabricating and installing over 1500' of aluminum and stainless steel cable style railings and stairs at the new Dana Dykhouse stadium in Brookings, SD; every railing needed to be field engineered by us, fabricated in-house by our shop personnel and installed by our installation crew.  This was a 2-year building project at a total of $800,000.00 worth of railings.